Saudi Arabia's Infrastructure is manufactured with the molds of Dema Formwork System. Fully automated double and single compartment 36 culvert molds were manufactured in a short period of 1.5 months and delivered to Riyadh in working condition.
The molds we have made are working with +/- 2mm precision and will pour thousands of culverts that Riyadh needs.
Tamam